Back

Massachusetts

Turnpike Road
Ashby, MA

Span: 23' 9" o/a
Roadway: 27' 6"
Year built: 1993

 
   
Potterville Road
Charlton, MA

Span: 21' 6" o/a
Roadway: 18' 6"
Year built: 1993

 
   
Winchell Road
Granville, MA

Span: 44' 10" o/a
Roadway: 12' 0"
Year built: 1996

 
   
Ripley Road
Granville, MA

Span: 50' 0" o/a
Roadway: 13' 10"
Year built: 1994

 
   
300 Canal Street
Lawrence, MA

Span: 88' 4" o/a
Roadway: 20' 0"
Sidewalk: 5' 0"
Year built: 1998

 
   
Curve Street
Medfield, MA

Span: 35' 7" o/a
Roadway: 29' 0"
Sidewalk: 4' 0"
Year built: 1993

 
   
Monroe Bridge
Monroe, MA

Span: 151' 11" o/a
Roadway: 24' 0"
Sidewalk: 5' 0"
Year built: 1992

 
   
Monson Development Center
Monson, MA

Span: 39' 11" o/a
Roadway: 22' 0"
Sidewalk: 5' 0"
Year built: 1999

 
   
Walnut Street Footbridge
Natick, MA

Span: 79' 1" o/a
Walkway: 14' 0"
Year built: 1996

 
   
Town Farm Road
Princeton, MA

Span: 36' 0" o/a
Roadway: 14' 0"
Year built: 1992

 
   
Stockbridge Road
Scituate, MA

Span: 48' 4" o/a
Roadway: 28' 0"
Year built: 1993

 
   
Bridge Street
Southborough, MA

Span: 59' 8" o/a
Roadway: 18' 2"
Sidewalk: 5' 0"
Year built: 1994

 
   
Thompson Pond Road
Spencer, MA

Span: 20' 3" o/a
Roadway: 18' 0"
Year built: 1993

 
   
Hartwell Street
West Boylston, MA

Span: 46' 6" o/a
Roadway: 16' 9"
Year built: 1995

 
   
Bertera Dodge Driveway
Westfield, MA

Span: 54' 0" o/a
Roadway: 16' 0"
Year built: 1997

 
   
Lovers Lane Estates Driveway
Weston, MA

Span: 16' 0" o/a
Roadway: 12' 0"
Year built: 1997

 
   


profile


roadway

Adamsville Road
Colrain, MA

Span:115' 6" o/a
Roadway: 22' 0"
Year built: Sept 1999

   


profile


roadway

Hickory Ridge Road
Conway, MA

Span:64' 0" o/a
Roadway: 14' 0"
Year built: Sept 1999
(Railing by others)

   

profile


roadway

Old Farm Road
Princeton, MA

Span: 50' 0" o/a
Roadway: 14' 0"
Steel: A-572 Galvanized
Loading: HS-20
Deck: 5 ga. 3"x9" galv. corr.

Year built: Nov 2001

     

profile

roadway

Lee, MA. Golden Hill Road   

Span:100' c/c bearings     Roadway:20'-4" clear.
Truss Steel: 588 weathering.        Floor Beams and stringers: A572
Galvanized.         
Loading: HS-25. 
Built: February 2005. 

     

profile


roadway

River Rd
Conway, MA. Reed Bridge Road

Span: 66' o/a   
Roadway: 14' clear    
Loading HS-25     Steel: A588
Deck: 8" concrete by others     
Rail: 3-line w/pickets    
Built: October 2005

     

profile

roadway

Lawrence, MA. 270 Canal Street

Span: 84'-6" o/a Roadway: 22' clear w/5' sidewalk Steel A572 Galvanized Loading: HS-20 Deck: 5 guage 3"x9" galv. corrugated Railing: Thrie beam and wire mesh
Built: June 2007

© 2000 Dopp & Dopp Associates, Inc.

84 Ferry Street, Hudson, NH 03051
ph: 888-566-3677
fx: 888-329-3677
email: doppdopp@aol.com